Friday, September 18, 2009

Project Bidding Cunningham Math/Science Building LA860001 200400884201 v14

Cunningham Math/Science Building LA860001 200400884201 v14



5151 Pacific Ave, San Joaquin Delta College
Stockton, CA 95207-6304 USA
CA(SAN JOAQUIN)
* Action stage: * GC Bidding

* Bid date: 10/15/2009 @ 01:03 PM PDT


Valuation: $ 64,000,000


* First issue bid stage IND: Y.

* Project delivery system: Construction Management Agency

Owner type: Local Government

Source of funding: Measure L



Project Overview
Project type: College/University.
Report type: Project
Sub project count: 0
First publish date: 01/05/2005
Prior publish date: 09/02/2009
Publisher: McGraw-Hill Construction Dodge
Type of Work: New Project
Status: GC (pre qual closed list) bids to Owner October 15 at 1:30PM - Mand pre bid Sept 21 at 11:30AM Purch Office - Plans on web http://www.deltacollege.edu/dept/purchasing/SJDCBusinessOpportunities.html - Inq to CM

Status project delivery
system: Construction Management Agency

Publish date: 09/16/2009

Key Contacts and Bid Documents
Submit bids to: Owner (Public)
Architect: tBP Architects, Richard Mangum - AIA (Architect), 1000 Burnett Ave Concord, CA 94520-2000 (USA) , Phone:925-246-6419, Fax:925-246-6495, E-mail:rmangum@tbparchitecture.com, http://www.tbparchitecture.com

Civil Engineer: Sandis, Jeffery Setera (Civil Engineer), 1721 Broadway Ste 201 Oakland, CA 94612-2105 (USA) , Phone:415-282-8220, Fax:415-821-0363
Construction Manager: Kitchell (Delta CC Bond Measure L Office), Construction Management (PM/CM), 5405 N Pershing Ave Stockton, CA 95207-5451 (USA) , Phone:209-954-5757, E-mail:bartonr@kitchell.com Email ID : bartonr@kitchell.com
Electrical Engineer: O'Mahony & Myer, Pieter Colenbrander (Electrical Engineer), 4340 Redwood Hwy Ste 245 San Rafael, CA 94903-2105 (USA) , Phone:415-492-0420, Fax:415-479-9662, E-mail:pcolenbrander@ommconsulting.com
Landscape Architect: Keller Mitchell & Company, Jerrold Mitchell (Principal), 302 4th St Oakland, CA 94607-4106 (USA) , Phone:510-451-9987, Fax:510-452-9987, E-mail:info@kellermitchell.com, http://www.kellermitchell.com/index.html

Mechanical Engineer: Ainsworth Associates, Steven Ainsworth (Mechanical Engineer), 3741 Business Dr Sacramento, CA 95820-2165 (USA) , Phone:916-737-6014, Fax:916-737-6015, E-mail:SAINSWORTH@AA-ME.COM, http://www.aa-me.com
Email ID : SAINSWORTH@AA-ME.COM
Owner (Public): San Joaquin Delta Community College, Purchasing Office 5151 Pacific Ave Danner Hall, Lower Danner Stockton, CA 95207-6304 (USA) , Phone:209-954-5065, Fax:209-954-5601, E-mail:lkelso@sjdccd.cc.ca.us., http://www.deltacollege.edu/dept/purchasing/SJDCBu

Structural Engineer: Thornton Tomasetti/Dasse Design Inc, Joe Sutton - PE (Principal), 33 New Montgomery St Ste 850 San Francisco, CA 94105-4525 (USA) , Phone:415-243-8400, Fax:415-243-9165, E-mail:sutton@dasse.com, http://www.dasse.com

Notes: CRSW05 - Class B license required - Plans may also be obtained on CD (no charge) from Owner 209-954-5065 - Direct Technical questions in writing by Oct 2 at 3 PM to Construction Manager Rick Barton at Kitchell CEM via fax 209-729-4029 or email rbarton@kitchell.com - General bid questions are to be directed to Maria Bernardino Dir of Purchasing via fax 209-954-3737 or email mbernardino@deltacollege.edu - Plans/Specs in transit - Available at http://network.construction.com within approx 48 hours
Bonds: 10% Bid Bond. 100% Performance Bond. 100% Payment Bond.
*Plans available from: *Owner (Public) on line or CD

Structural Details
Structural information: 1 Building/ 3 Stories above grade / 0 Story below grade / 190,000 Total square ft / Building Frame: Structural Steel

Additional features: The construction consists of a new three story math & science complex including a 70,000 sf laboratory core, with primarily dry labs on the first floor, wet Biology labs on the second floor, and chemistry labs on the third floor. There is 20,000 sf of office space and 20,000 sf of classrooms on each floor dedicated to each discipline, primarily in separate zones. The labs wrap around a central service core consisting of tech offices, lab preparation rooms, and lab storage rooms. Students will enter the labs from the opposite side of the central service core providing safe separation of students and chemicals. Student break-out spaces, computer labs, and a resource center

Project Bidding Bert Crane WWTP Improvements 062

Bert Crane WWTP Improvements 062 200600620819 v37


(A) Filter Conformed Pre-Purchase RFP

(B) Aqua-Aerobic Systems-Proposal Package

(C) Aqua-Aerobic Approved as Noted Submittal

(D) UV Conformed Pre-Purchase RFP

(E) Trojan UV-Proposal for Ultraviolet Disinfection Equipment


550 Commerce Ave
Atwater, CA 95301-9411 USA
CA(MERCED)
Action stage: GC Bidding

Bid date: 10/14/2009 @ 02:00 PM PDT


Valuation: $ 69,000,000


Project delivery system: Design-Bid-Build

Owner type: Local Government



Project Overview
Project type: Sewage Treatment Plant.
Report type: Project
Sub project count: 5
First publish date: 01/26/2006
Prior publish date: 09/15/2009
Publisher: McGraw-Hill Construction Dodge
Type of Work: New Project
Status: Bid date extended from September 30 - Pre-Qualified GC bids (list closed and complete) to owner October 14 at 2 PM (PDT) - Mandatory prebid September 9 - Plans from Stockton Blue 209-524-2924 - $500 charge

Status project delivery
system: Design-Bid-Build

Publish date: 09/18/2009

Key Contacts and Bid Documents
Submit bids to: Owner (Public)
Civil Engineer: ECO:LOGIC Engineering, Inc., Jack Harbour (Project Manager), 3875 Atherton Rd Ste 1 Rocklin, CA 95765-3716 (USA) , Phone:916-773-8100, Fax:916-773-8448, E-mail:harbour@ecologic-eng.com, http://www.ecologic-eng.com/index.html
Email ID : harbour@ecologic-eng.com
Electrical Engineer: Frisch Engineering, Inc., Tom Frisch 110 Blue Ravine Rd Ste 101 Folsom, CA 95630-4712 (USA) , Phone:916-353-1025, Fax:916-353-1028
Engineer: West Yost & Associates, Project Engineer 2020 Research Park Dr- Ste 100 Davis, CA 95616-2687 (USA) , Phone:530-756-5905, Fax:530-756-5991, E-mail:davis@westyost.com
Owner (Public): City of Atwater, City Clerk 750 Bellevue Rd Atwater, CA 95301-2859 (USA) , Phone:209-357-6300, Fax:209-357-6890, E-mail:cityclerk@atwater.org, http://www.atwater.org/

Reprographer: Stockton Blue (Modesto ), 1801 H St Ste D4 Modesto, CA 95354-1221 (USA) , Phone:209-524-2924, Fax:209-524-2927, http://www.stocktonblue.com

Notes: BNSW08 - Class A license - Technical questions to Jack A Harbour at Fax: 916-773-8448 or email to harbour@ecologic-eng.com - The bid date was unofficially moved to October 14th and that was to be confirmed by Addendum Number One later this week. There is a chance that the date in the addendum may change to October 21st
Bonds: 10% Bid Bond. 100% Performance Bond. 100% Payment Bond.
Plans on file: Sacramento, CA Planroom

*Plans available from: *Reprographer - US$ 500 deposit.
Addenda film date: 09/16/2009
Addenda receive date: EP/-2/15-S

Additional features: construct new wastewater treatment facility of 6 MGD design - Headworks with adjacent Flow Metering Facility, Vactor Waste Receiving - Station, Oxidation Ditch Flow Splitter Box, Oxidation Ditches Nos. 1 and 2, Supplemental Carbon Facility, Flocculant Chemical Facility, Mixed Liquor Distribution Box, Secondary Clarifiers Nos. 1, 2 and 3, RAS Pump Stations Clarifiers Nos. 1, 2 and 3, Scum Pump Station Clarifiers Nos. 1, 2 and 3, Filamentous Control Facility, Filter Influent Pump Station - Filter Facility, UV Disinfection & W3 Pumping Facility, Aerobic Digesters Nos. 1 and 2 with Supernatent Pump Station, Biosolids Dewatering Facility, Storm Drain Pump Station, Plant Sewage Pump Station, Plant Drain Pump Station, Electrical Buildings, Domestic Well, Odor Control Chemical Facility, Electrical/Instrumentation/Control including SCADA systems, related Appurtenant Work and related Sitework Improvements

Project Bidding Mission Community College - Hospitality Management Building 100910

Mission Community College - Hospitality Management Building 100910 200900442889 v23


(A) Renovation and Expansion


3000 Mission College Bl
Santa Clara, CA 95054 USA
CA(SANTA CLARA)
* Action stage: * GC Bidding

Bid date: 09/29/2009 @ 02:00 PM PDT


Valuation: $ 6,000,000


Project delivery system: Design-Bid-Build

Owner type: Local Government



Project Overview
Project type: College/University.
Report type: Project
Sub project count: 1
First publish date: 02/13/2009
Prior publish date: 09/15/2009
Publisher: McGraw-Hill Construction Dodge
Type of Work: New Project
Status: Add Bidder - GC bids to Owner Sept 29 at 2 PM (PDT) - Mandatory job walk Sept 10 at 10 am - Plans at San Jose Blue (408)295-5770 - Inq to Swinerton , CM 408-855-5537 - email phempel@swinerton.com

Status project delivery
system: Design-Bid-Build

Publish date: 09/17/2009

Key Contacts and Bid Documents
Submit bids to: Owner (Public)
Architect: Lionakis Beaumont Design Group, Dave Younger (Project Architect), 1919 19th St Sacramento, CA 95814-6714 (USA) , Phone:916-558-1900, Fax:916-558-1919, E-mail:dave.younger@lbdg.com, http://www.lionakis.com

Civil Engineer: Sandis Humber Jones, Ken Olcott (Civil Engineer), 605 Castro St Mountain View, CA 94041-2011 (USA) , Phone:650-969-6900, Fax:650-969-6472, http://www.sandis.net

Construction Manager: Swinerton Mgmnt (WestValley Mission College), Peter Hempel (Project Mgr), 14000 Fruitvale Ave Saratoga, CA 95070-5640 (USA) , Phone:408-855-5537, Fax:408-867-6328, E-mail:phempel@swinerton.com Email ID : phempel@swinerton.com
Consultant: Smith, Fause & McDonald, Inc., Peter McDonald (Engineer), 351 8th St San Francisco, CA 94103-4401 (USA) , Phone:415-255-9140, Fax:415-255-9180, E-mail:info@sfmi.com
Electrical Engineer: Ken Rubitsky & Asscociates, Ken Rubitsky - EE (Principal), 1910 S St Sacramento, CA 95814-6818 (USA) , Phone:916-447-4477, Fax:916-447-4047, E-mail:kenr@kraee.com
Food Service Consult: Patrick Stein & Associates, Patrick Stein 5669 Snell Ave PMB 235 San Jose, CA 95123-3328 (USA) , Phone:408-360-9881, Fax:408-360-9878
Mechanical Engineer: Turley & Associates, Brian Provencal (ME/President), 1914 S St Sacramento, CA 95814 (USA) , Phone:916-325-1065, Fax:916-325-1075, E-mail:bprovencal@turleymech.com, http://www.turleymech.com

Owner (Public): West Valley Mission Community College District, Bridget Espinosa (Director Gen Service), 14000 Fruitvale Ave Saratoga, CA 95070-5640 (USA) , Phone:408-741-2195, Fax:408-867-3830, E-mail:http://www.wvm.edu/email.php?contact=1012541, http://www.wvmccd.cc.ca.us/facilities/west_valley/

Reprographer: San Jose Blueprint Company, Plan Distribution 835 W Julian St San Jose, CA 95126-2716 (USA) , Phone:408-295-5770 Ext:126, Fax:408-286-7122, E-mail:planwell@sjblue.com, http://www.sjblue.com

Structural Engineer: Lionakis Beaumont Design Group, Kerry Volker (Structural Engineer), 1919 19th St Sacramento, CA 95814-6714 (USA) , Phone:916-558-1900, Fax:916-558-1919, E-mail:kerry.volker@lbdg.com, http://www.lionakis.com
Email ID : kerry.volker@lbdg.com
Notes: PCNW06 - Class B license required - Plan Sheet FS04.00 was not submitted with the initial plans and specs and will be forthcoming in the first addena
Bonds: 10% Bid Bond.
Plans on file: Dublin, CA Planroom

Plans available from: Reprographer - US$ 300 deposit. non refundable

Structural Details
Structural information: 1 Building/ 1 Story above grade / 0 Story below grade / 134,462 Total square ft / Building Frame: Structural Steel

Project Bidding Galt WWTP Tertiary Filtration Facil & Biosolids Improv 2009 56H

Galt WWTP Tertiary Filtration Facil & Biosolids Improv 2009 56H 200800795536 v19


(A) Exhibit D Bid Spec for City of Galt Tertiary Filtration Equ


Intersection of Highway 99, and Twin Cities Rd
Galt, CA 95632 USA
CA(SACRAMENTO)
Action stage: GC Bidding

Bid date: 09/23/2009 @ 02:05 PM PDT


Valuation: $ L


Project delivery system: GC to be Competitively Bid

Owner type: Local Government



Project Overview
Project type: Water Treatment Plant.
Report type: Project
Sub project count: 1
First publish date: 09/04/2008
Prior publish date: 09/08/2009
Publisher: McGraw-Hill Construction Dodge
Type of Work: New Project
Status: GC Bids to Owner September 23 at 2:05 PM (PDT) Mandatory pre bid conference Aug 27 -Plans from West Yost Assoc c/o Stockton Blue (209/464-8724) - Add 1A issued

Status project delivery
system: GC to be Competitively Bid

Publish date: 09/17/2009

Key Contacts and Bid Documents
Submit bids to: Owner (Public)
Civil Engineer: Eco Logic, 2260 Douglas Blvd Ste 160 Roseville, CA 95661-4209 (USA) , Phone:916-782-9100, Fax:916-782-9134
Engineer: West Yost & Associates, Chris Ewers 1380 Lead Hill Blvd Ste 201 Roseville, CA 95661-2997 (USA) , Phone:916-789-1090, Fax:916-789-1306
Mechanical Engineer: Interface Engineering, Project Engineer 8950 Cal Center Dr Ste 250 Sacramento, CA 95826-3225 (USA) , Phone:916-288-6202, Fax:916-288-6250
Owner (Public): City of Galt, 380 Civic Dr Galt, CA 95632-2039 (USA) , Phone:209-366-7260, Fax:209-745-0811, E-mail:clerk@ci.galt.ca.us, http://www.ci.galt.ca.us/

Notes: BNSW08 - Addendum 1 and 1A issued - Reeve-Knight Const. has withdrawn from bidding
Bonds: 10% Bid Bond. 100% Performance Bond. 100% Payment Bond.
Plans on file: Sacramento, CA Planroom

*Plans available from: *Reprographer
Addenda film date: 08/25/2009
Addenda receive date: UG/-2/25-A

Additional features: New opperations building , UV disinfection Cloth filters

Tuesday, August 4, 2009

TECH TIP --- Vertical Curing Application

DO NOT delay in applying the curing compound!

For vertical applications, apply two light coats.
Apply the second coat while the first coat is still wet.
During vertical spray applications, use a fine spray tip and apply
even coats avoiding run-downs or streaks.
Clear Dissipating Cure EF will normally begin to dissipate and wear off within 5-7 days after application. At this time product can
be removed with water under pressure or using scrubbing
equipment or with Dayton Superior Citrus cleaners or can be
allowed to fully dissipate on its own. The amount of
time required for full dissipation is dependent upon
application rate, environmental conditions and the
amount of traffic wear the surface receives.