Sunday, June 14, 2009

Project Bidding --- Structural Concrete

Guadalupe River Project 3A Phase 3 W9123809B0002 200700793915 v11


(A) Volume 1

(B) Volume 2

(C) Volume 3


Down Town San Jose
San Jose, CA 95101 USA
CA(SANTA CLARA)
Action stage: Bidding

Bid date: 06/29/2009 @ 01:00 PM PDT


Valuation: $ 10,000,000 - 20,000,000


Owner type: Federal



Key Contacts and Bid Documents
Submit bids to: Owner (Public)
Architect: U S Army Corps of Engineers-Sacramento District, Angkham Sybangone (Contract Specialist), 1325 J St Sacramento, CA 95814-2928 (USA) , Phone:916-557-5231, Fax:916-557-7842, E-mail:angkham.a.sybangone@usace.army.mil, http://www.fbo.gov
Email ID : angkham.a.sybangone@usace.army.mil
Owner (Public): U S Army Corps of Engineers-Sacramento District, Shirley Martin (Contracts), 1325 J St Sacramento, CA 95814-2928 (USA) , Phone:916-557-6933, Fax:916-557-7842, E-mail:Shirley.A.Martin@usace.army.mil, http://www.fbo.gov
Marsha Sells 916-557-5232
Notes: BDSW01
Plans available from: Owner (Public)

Bidders List
Bidders Bid amount Contact name Phone # Fax #
Gordon N Ball Inc
333 Camille Ave
Alamo, CA 94507 925-838-5675 925-838-5915
RGW Construction
PO Box 2910
Livermore, CA 94551 925-606-2400 925-961-1925
William P Young Construction
1777 Neptune Dr
San Leandro, CA 94577 510-351-7004 510-351-8102
RMT Landscape Contractors
7699 Edgewater
Oakland, CA 94621 510-568-3208 510-568-3766

Additional features: Contract 3A Phase 3 consisting of structural and channel improvements at Coleman Avenue, Coleman Bridge and replacement of UPRR bridg es Nos. 3 (vehicular bridge) and 4 (railroad bridge) between New Julian Avenue and Coleman Avenue, all in downtown San Jose, California. The primary objective is to provide 100 year flood protection to the areas of San Jose adjacent to the river by strengthening the Coleman Avenue bridge abutments, constructing a two-track railroad bridge (trestle/steel piling, approximately 40-feet wide by 175-feet long) and associated approaches, constructing a vehicular bridge (concrete girder, two-lane with two pedestr ian sidewalks and two bike lanes, approximately 50-feet wide by 200-feet long), constructing a pedestrian under crossing, constructing a maintenance road, and constructing environmental restoration features. The work is necessary to provide hydraulic capa city not provided by the previous bridges and to also provide the required recreational features

Project Overview
Project type: Flood Control. Bridge.
Report type: Project
Sub project count: 3
First publish date: 07/13/2007
Prior publish date: 06/08/2009
Publisher: McGraw-Hill Construction Dodge
Type of Work: Alterations
Status: Add bidder - Bids to Owner June 29 at 1 PM (PDT) - Site Visit June 8 at 10:30 AM at 438 Coleman Ave - Documents available on Owners web www.fbo.gov

Project exception: ARRA Stimulus

Publish date: 06/09/2009

No comments:

Post a Comment